Motion Picture and Television Retirement Fund
EIR No. 391-84-CUZ(ZV)(Supplemental)
Table of Contents
List of Figures
List of Tables
I. SUMMARY
- Project Location and Description
- Background
- Pre-Circulation Issues
- Areas of Controversy
- Summary of Alternatives
- SEIR Format
- Impact and Mitigation Measure Summary
II. PROJECT DESCRIPTION
- Statement of Objectives
- Location and Boundaries
- Project Characteristics
III. ENVIRONMENTAL SETTING
- Overview of Environmental Setting
- Related Projects
IV. ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES
- Earth
- Grading
- Geologic Hazards (Seismicity) (b)
- Air
- Air Quality (Construction)
- Air Quality (Operational) (b)
- Meteorology (a)
- Water
- Surface Water Runoff (b)
- Ground Water (a)
- Flood Hazard/Mudflow Hazard
- Biota
- Noise (b)
- Light
- Artificial (b)
- Natural - Shade/Shadow (a)
- Land Use
- Zoning (b)
- Community Plan
- General Plan Elements
- Regional, State, Federal Plans (a)
- Natural Resources (a)
- Risk of Upset (a)
- Population (b)
- Housing (a)
- Right-of-Way and Access (a)
- Transportation and Circulation
- Traffic
- Parking (b)
- Site Access (b)
- Public Services
- Fire Protection
- Police Protection (b)
- Schools (b)
- Parks and Recreation (b)
- Libraries (b)
- Utilities
- Energy (a)
- Communication Systems (a)
- Water (b)
- Sanitary Sewers
- Storm Water Drainage (b)
- Solid Waste and Disposal
- Safety (a)
- Aesthetics/View
- Cultural Resources
- Archaeological
- Paleontological (a)
- Historical (a)
V. LONG-TERM IMPLICATIONS OF THE PROPOSED PROJECT
- Relationship Between Local Short-Term Uses of Man's Environment and the Maintenance and Enhancement of Long-Term Productivity
- Irreversible Environmental Changes Which Would be Involved in the Proposed Action Should it be Implemented
VI. GROWTH-INDUCING IMPACT OF THE PROPOSED PROJECT
- How Project could Foster Growth
- Cumulative Impacts of Related Projects
VII. ALTERNATIVES
- No Project (Build-Out of Entitlements)
- Change in Land Use: Existing Zoning
- Change in Land Use: Community Plan
- Change in Site Plan: Reduced Height on Southern Portion of Site
- Change in Site Plan: New Construction Limited to Developed Portion of Site
VIII. ORGANIZATIONS AND PERSONS CONTACTED
IX. ESAC ACTION, INITIAL STUDY AND WORKSHEET
X. APPENDICES (Under Separate Cover)
- NOP Comments
- Geologic, Seismic and Soil Engineering Study
- Air Quality/Noise Study
- Hydrology Study
- Biological Resources
- Traffic Impact Study
FOOTNOTES
- Determined not significant by the October 4, 1984, and the January 22, 1999, Initial Studies.
- Determined not significant by the October 4, 1984 Initial Study. Determined potentially significant by the January 22, 1999 Initial Study. Information is provided in this document.
LIST OF FIGURES
- Regional Map
- Vicinity Map
- Existing Site Plan
- Proposed Site Plan
- Radius Map
- Aerial Photo
- Related Projects
- Area of Liquefaction Hazard
- Major Faults in the Los Angeles Area
- Existing Storm Water Drainage Patterns
- Post-Development Storm Water Drainage Patterns
- Existing Plant Community Map
- Sensitive Receptor Areas
- Community Plan
- Major Equestrian and Hiking Trails Plan of the Recreation Element
- Proposed Equestrian Trails
- Existing Lane Configuration
- Existing Traffic Volumes AM
- Existing Traffic Volumes PM
- Project Trip Distribution
- Phase I Project Traffic Volumes AM
- Phase I Project Traffic Volumes PM
- Project Build-Out Traffic Volumes AM
- Project Build-Out Traffic Volumes PM
- Related Projects Traffic Volumes AM
- Related Projects Traffic Volumes PM
- Year 2005 Existing with Ambient Growth AM Volumes
- Year 2005 Existing with Ambient Growth PM Volumes
- Year 2015 Existing with Ambient Growth AM Volumes
- Year 2015 Existing with Ambient Growth PM Volumes
- Future 2005 Pre-Project Traffic Volumes AM
- Future 2005 Pre-Project Traffic Volumes PM
- Future 2015 Pre-Project Traffic Volumes AM
- Future 2015 Pre-Project Traffic Volumes PM
- Future with Phase I Traffic Volumes AM
- Future with Phase I Traffic Volumes PM
- Future with Project Build-Out Traffic Volumes AM
- Future with Project Build-Out Traffic Volumes PM
- Site Access Plan
- Public Facilities Map
- Views South from Mulholland Drive at Valley Circle Boulevard
- Views North from Mulholland Drive South of Subject Site
- Views North and West from Mulholland Drive at Southern Portion of Subject Site
- Views East from Calabasas Road
- Views North from Valmar Road
- Views East from Park Sorrento
- Landscape Plan
- Cross-Section Key
- Cross Sections
LIST OF TABLES
(Tables are found accompanying the text of this EIR.
- Project Site Land Area Breakdown
- Proposed Master Plan Breakdown
- Proposed Master Plan Development
- Proposed Phase One
- Proposed Phase Two
- Equivalency Table
- Master Plan Comparison
- Maximum Credible Earthquakes
- Maximum Probable Earthquakes
- State and Federal Ambient Air Quality Standards
- 1996-1998 Criteria Pollutant Violations
- SCAQMD Threshold Criteria (Construction)
- Daily Construction Emissions - Phase I
- Daily Construction Emissions - Phase II
- Worst-Case PM10 Concentrations
- Mitigated Daily Construction Emissions - Phase I
- Mitigated Daily Construction Emissions - Phase II
- Worst-Case PM10 Concentrations with Mitigation
- Existing Carbon Monoxide (CO) Concentrations
- SCAQMD Threshold Criteria (Operational)
- Daily Operations Emissions (Pounds Per Day)
- 2015 Carbon Monoxide (CO) Concentrations
- Cumulative Project Operational Impact Analysis
- Existing Storm Water Runoff
- Post-Development Storm Water Runoff
- Existing Noise Levels (dBA)
- Community Compatibility Noise Exposure Chart
- Outdoor Construction Noise Levels
- Worst-Case Construction Noise (dBA)
- Operational Noise Impacts
- Cumulative Noise Impacts
- Existing Traffic Volumes
- Level of Service as a Function of CMA Values
- Existing Capacity and Level of Service
- Net Development by Phase
- Phase I Project Trip Generation
- Project Build-Out Trip Generation
- Related Projects Trip Generation
- Phase I Summary of Volume to Capacity Ratio and Levels of Service
- Project Build-Out Summary of Volume to Capacity Ratios and Levels of Service
- Local Parks and Recreation Centers
- Construction Equipment Fuel Consumption
- Related Projects Annual Electric Energy Usage
- Related Projects Monthly Natural Gas Usage
- Related Projects Daily Water Consumption
- Related Project Sewage Generation
- Existing Disposal Facility County of Los Angeles
- Related Projects Solid Waste Generation
Copyright 2000, 2001 Erik W. Olson, Valley LISP Consulting
Last Modified: February 01, 2001